How to assign different cost center to a work center with diff validity period

Dear SAP Gurus, I want to assign a new cost center(which got created) for a existing work center effective 01.Jan.2016. I want to have the existing cost center assignment to continue till 31.12.2015....

View Article


CO28 profiles

FYI: CO28 (old-COOIS) profiles can be edited in SM30: V_TCOAD using table IOHEADER or IOITEM. Sub-profiles can be edited from Extras-menu. Our production people prefer CO28 over COOIS.

View Article


display 0% load work center in MC38

Dear Expert ; After running my scenario , i checked cm38 for a planner group , every thing is ok except i cant see the work centers with no load ? plz help

View Article

How can I manage batck key in process order component?

Hi, when I create a process order I have a material code that has no value in Batch Key field. So when I release for automatic batch determination, the system doesn't check the batch for that...

View Article

Create reservation almost expired stock

Initial situationStandard SAP does not take into account the batch level so a shortfall of stock due to expired shelf life will only be detected until the batch actually expires and in that case it...

View Article


Image may be NSFW.
Clik here to view.

How to get the scrap percentage for a production order?

Hi SAP Experts Currently we are working on a new Production Order Report We are trying to get the "scrap portion percentage" from a "closed" production order.(The technical name for this is within an...

View Article

Routing user fields

Hi Experts, I need to enter new parameters in our routingsHow can I define user fields in routings that I can fill/display within CA01/CA02 ? Thanks in advance

View Article

No entry found/selected for search criteria

Dear SAP Experts, I am facing an issue . We have developed application for production order creation to confirmation. When i start process it shows me errorNo entry found/selected for search criteria...

View Article


Reserved and Schedule for delivery qty is showing in during batch determination

Dear all,We are facing a strange issue after EHP7 upgrade. In some of the process order during batch determination manually, reserved qty is also showing. Though it is not possible to allocate the qty...

View Article


To have planned order Basic start time as per factory start time

Hello all, I have a plant that starts from 07:00.When i convert planned order to production order, i see the Basic start time as 00:00.Could this be made to show as 07:00.I have the workcenter already...

View Article

Image may be NSFW.
Clik here to view.

Change start/end date of operations in CO02

Hi experts, Is it possible in production order change (t_code: CO02) to change the operation start dates/times of specific operations and recalculate the dates and times of the consecutive operations?...

View Article

Variant configuration on Routing

Hi Experts. I have a question, I am working on a project where the FG is configurable material and MTO (obviously) I want to make a routing for my FG and I want to over write my first standard value....

View Article

Batch classification issue (screen)

Hello experts, I am facing strange issue. in co15 when i enter order no ( prod order ),then press enter. then i select material, click on components--> batch management--->create batch,then...

View Article


Alternative UOM for Reporting point operation in Repetitive Manufacturing

Hi Gurus, I have a scenario where one of my operation is reporting point and it has FT2 as Operation unit & PC as base unit in task List. I created new material and did all the master data and only...

View Article

MRp net requirement quantity

Hi All We are adding QC samples in process order quantity using enhancement in process orders. Now we want to exclude this additional QC samples  quantity in MRP net requirement calculation when pegged...

View Article


how to make process orders in this scenario?

There is spindraw machines in spinning process. this type of machine has 30 positions from which 30 diffrent yarn products are obtained. How will be the Process order in this scenario? client doesn't...

View Article

What is PRT

Dear all,Please guide about PRT , usage in Routing & which data is responsible in material master or another area please give me basic knowledge about this.thanksUday Pratap

View Article


How to design SAP process orders in spinning industry?

How the SAP process orders to be designed? There are various stages (spindraw, ply twist, winding, rewinding). Will there be SAP Process orders for every stage? are these process orders will be of...

View Article

Planning scenario assign to the year in long term Planning

Hi Experts I have created a planning version in OMP2 and planning scenario via MS31. How can i assign this Planning scenario to the year (e.g.2015, 2016). RegardsVishal

View Article

Planned delivery time is not taken into consideration when creating PR

Good afternoon. I am running an MTS scenario, where i am using EX as lot size and PD as MRP type. When i run MRP for my material,MRP creates one Purchase requisition per day (grouping daily reqs, as it...