Hi Experts,

 

I have runned MRP on 01.12.2015 and planned order is created on the same day. I have changed the production BOM on 10.12.2015.I have converted the planned order which is generated on 01.12.2015 into Production order on 05.01.2016.Now the requirement is the production order should contain the new BOM (i.e changed on 10.12.2015) .Is it possible to have new BOM in the Production Order  with any configuration settings? Please suggest me on this issue.