Dear Experts,
Here I am having a situation I am using standard Formula SAP006 and this formula says (Machine * Operation quantity / Base quantity) and currently I have taken No of Individual capacity and No of split is 1.
I have 100 available hrs( this is a requirement that job need to complete in this much time) and need to complete the job in a single day in two shifts and each shift of 9 Hrs with 1 Hr break in each shift.
What other factors and formula I need to use for capturing above requirement.