Capacity Calculation Formula

Dear Experts,Here I am having a situation I am using standard Formula SAP006 and this formula says (Machine * Operation quantity / Base quantity) and currently I have taken No of Individual capacity...

View Article


Need to capture the production losses in SAP while equipment's breakdown in...

Hello SAP Experts, Please advise if anyone worked on the production losses due to equipment breakdowns in the shop floor controls, share your inputs to help us to implement this functionality in our...

View Article


SQL error 1205 ATP_RESB When Product Confirmation

Hello Dear Experts, I get shortdump at PP modüle when product confirmation. Are there any experts, come across and solved this issue?Maybe  there SAP note for this issue at SAP Note. Best regards....

View Article

Wrong quotation in MRP via production versions

Hello everybody, we are using quota arrangement in MRP via production versions. In the lot size indicator split quota is not set. This construct worked quite well in ECC 6.0 EHP 3.Since moving to EHP 7...

View Article

Automatic Batch determination

Dear all, I am facing a problem while releasing production order. Batches of components are not being determined automatically when Production order is released. MRP 2 of Material master setting for...

View Article


Blocked Planned Orders creation in MRP run

Hi all, Hope you are fine. I need your help on this case. Scenario:  Plant 1 received forecast as “Independent Requirement” from another soft (FuturMaster). This IR contains needs from Plant 2 and...

View Article

Supplying plant update in PR

Hi all, Hope you were fine. With our customizing we generated a PR with fixed vendor but without supplying plant from MRP. I found a stange behaviour but I am not sure it is normal or not. When we...

View Article

Slowness to create production order

Hi Gurus,   When I'm in CO01, will create the production order, it takes 2-3 minutes to set up. I noticed that only happens to a product, which has a BOM of an item.The Material Avaliability is no...

View Article


Subreq in MD04

Hi All, I need your inputs for one issue which i am facing.. I have created a Subcon PO wrt PR.. now in MD04 the requirements are open for Raw material components. Now user deleted the SUBCON PO + PR...

View Article


Phantom Assembly BOM is not getting exploded in Routing During Component...

Hi Team, When I am trying to assign my phantom assembly components to a particular operation in routing but it is not displaying on screen. For example :A has two components B(Phantom) & D.further...

View Article

Dynamic Safety stock on immediate forward Period

Hi All, Need help with this issue.  Dynamic Safety stock on immediate forward Period   As per SAP configuration setting through transaction codeOMIA under the field Number of Periods, system is...

View Article

cooispi production plant

Hi All Iam not able to see all plants in field production plant in COOISPI Or COOIS. Please could you inform any configuration iam missing. I have already activated MRP for all plants and plant...

View Article

Issuing storage location is not considered while material consumption

Hi expertsI have a process order carrying 2 raw materials released on 2nd December 2015. One raw material is consumed & 1 caught in posting error [COGI]. Reason for error was stock deficit in...

View Article


Kanban Status Change Dates

Hello Gurus,I am working on Kanban scenario.I have different stages like -WAITEMPTYPROCESSTRANSITFULLIN USE For a Kanban ID - if it has passed to all stages, where can I see the dates on which bin was...

View Article

How can we always round up component quantity in production order...

Hi Experts, Can you please explain--->How can we always round up component quantity in production order confirmation if quantity is less than 0.5. Currently, when Good Issues occur as part of Order...

View Article


Capacity Planning for machines that share a pallet system

SAP GURU's  Please help. Scenario I have 3 machines which count as 3 different work centres. However these 3 machines share 11 pallet systems' (that are 4 side) that have a variety of fixtures mounted...

View Article

Difference between PKPS-SAEDT and PKPS-SADT2

Can anyone please tell me the difference between the two dates in table PKPS........ SAEDT    and SADT2 Where is this data coming from? thanks,Jan

View Article


revision level different between Material master and purchase orders

Hello, We have an issue with a wrong revision level triggered into a purchase order.( at the PO creation) the correct revision level is set in the material master but the PO triggers a wrong one and we...

View Article

Copying one Routing to several materials

Hi everyone, I have to change routing of several materials. However the routing is common for all the materials. So, i was thinking of changing the routing of one material and then copying this changed...

View Article

MRP group not maintained at material master level

Hello everyone, I have a situation where when trying to update a material to assign an MRP group we are having this message for a particular MRP area : "MRP group not maintained at material master...