Hello SAP Experts,
Please advise if anyone worked on the production losses due to equipment breakdowns in the shop floor controls, share your inputs to help us to implement this functionality in our chemical industry.
I have the following requirement on SAP PLA (Production Loss Accounting). How do I maintain these items as much as possible in SAP rather than using any third party tools?
- Accurately measure losses per each resource) and compares to true production data and production plans.
- Track events.
- Assign reasons for lost tonnes vs. Maximum Sustainable Rate.
- Assign total costs of lost production.
- Perato most common causes.
- Link to Root Cause Analysis.
- Link to Reliability, Quality and Safety incident reporting.
Thanks
Srini