Why consumptions disappear in forecast view if I change period indicator?
Hi,Why I don't see consumption when I change the period indicator in week?Same material with week, the consumptions disappear. Why? My doubt: when I execute a consumption I create an association with a...
View ArticleQE5N transaction
We released a product by mistake using transaction QE51N. How do we reverse it?
View ArticleCan Planning Calendar override Factory Calendar settings?
Hi Experts, We have a scenario wherein our Factory Calendar(US) is having 5 days working(Saturday's & Sunday's closed) & Capacity Planning/leveling Calendar(ZB) is having 365 days a year as...
View ArticleAbout Production supply area in KANBAN
Hi Gurus,One of my client is having below requirement in KANBAN.Change of Production supply area , Bins, in existing control cycle without deleting the control cycle.I havent worked in KANBAN before....
View ArticleRUN MRP WITHOUT CREATING PLANNED ORDER FOR PRODUCTION
Dear Gurus, In our scenario we need to create material requirement from MRP with the help of Sales schedule line and BOM explosion, but we don't want to create production planned order through MRP. Our...
View ArticleFinal Assembly with no. of Sub Assemblies
Hi Experts, Here i have a different scenario, i.e. I have Kit BOM - It consists of number of sub assemblies in one box. I'll be getting forecast for Kit BOM level from customer. I'll run MRP for Kit...
View ArticleLabel printing issue
Hi,I am facing one issue while printing the Batch related characteristic information on the Label in Variant configuration. The issue is that entire data is printing on the Label except one symbol "R"...
View ArticleComponent already withdrawn error
Hi, While trying to change batch number of one component I am getting error component already withdrawn. scenario is process order is released, TR, TO , confirmed but no 261 movement done. i want to...
View ArticlePrice Issue of Subcontracting material
Dear SAP Experts, I a m facing an rissue. When we un cost estimation for a particular material of Subcontracting, system is taking old PO in cost estimation run through t-code ck11n. We have created...
View ArticleSplit Valuation
Hi, We have a company with 2 plants. a product A which is produced in plant -1 But the same is received from our plant-2 as a raw material . Behavior of product A In Plant-1--- Raw material &...
View ArticleReport for Multi Level BOM with Change numbers
Dear Gurus, We had a requirement from user to extract the BOM level by level along with the change numbers(ECN) used on the date the change numbers are being updated in system. I tried with SQVI with...
View ArticleLSMW For BOM WITH TWO FLAT FILES (header & item).
Hi: I'm working with LSMW @ specify files i got the following error : LOGICAL FILE "ZFILE1" IS NOT ASSIGNED WITH PHYSICAL FILE "CS01_CS01_CS01.lsmw.conv" OS IS "WINDOWS". Pls help to fill the field in...
View ArticleMessage category: PI_CRST2
Hi Iam using Xstep and when i send process messages for Goods Issue and Goods receipt then those gets posted. one message (Message category: PI_CRST2) gets created and when i send it then i get...
View ArticleBOM Not Exploding With SPK 40
Hello Experts,My client is a manufacturer of gears and most of his business is running on subcontracting.Suppose they have two plants i.e Plant A and Plant B in which there are some materials in the...
View Articleuser-defined field in routing - define formulas
Hello,I created a new field-key "ZEGSTON" with user-defined fields:In routing I added values to diffrent fields:In customizing I created a new parameter "ZFAK01" using option "4".In customizing I...
View ArticleCan This be done in Standard SAP PP? Packing into smaller Bags
HI Experts, i have a scenario. Not sure Standard PP can handle it or not. We buy fertilizer in KG. Goods issues using Bag. it is around 50Kg per bag. We would like to repack it into smaller bag. says...
View Articledifferent shifts for one capacity type in one work center
Hi gurus! I have a problem with an avalible capacity of Work Center.In my case I have 2 groups of piople which are the one Work Center.caseOne have a shift 5 days (from 9 am to 6 pm) a week, another...
View ArticleMRP issue - MD02 is not creating PReq and PldOrd both if planning time fence...
Hi Folks, I need your help on an urgent issue regarding MRP. In general if we run MD02 with ‘Create purchase req.’ = 2, system creates PReq for the requirements within the opening period and Planned...
View ArticleMD04 - Purchase Req in reference to intercompany PO
Hi Folks, I need your help to understand how the system is working. Scenario: Company is using virtual plant concept and I am new to this. Plant A receiving the demand from customers and plant B...
View ArticleHow to read forecast errors?
Hi, where can I check the forecast error messages? And how does the system calculate the "Error total"? I can't understand how it could read the difference between consumptions and forecast if...
View Article