Material in Sales Order Stock
Hi Experts, The scenario is MTS scenario and there is no Customer specific production . The user has a created a delivery of material for sales order using 601 E movement type. After which a production...
View ArticleMRP and ATP
In MD62 header screen we are selecting "w/o MRP" check box for entered forecast. So MRP doesn't consider forecast for planning. In this case FERT material is make-to-stock type. So if there is stock...
View ArticleError Order Type Excluded for Master Data CHK!!! in COHV
Hi Experts, Please suggest me best solution for: I am going to set TECO status through COHV with the selection parameter- Production plant,System Status (TECO exclude and DLV) and execute it but when i...
View ArticleAbout Production supply area in KANBAN
Hi Gurus,One of my client is having below requirement in KANBAN.Change of Production supply area , Bins, in existing control cycle without deleting the control cycle.I havent worked in KANBAN before....
View ArticleReport for cost analysis over multiple PP orders
Hi experts, when you enter a PP-PI order over COR3 you can go to GoTo - Costs - Analysis.Now I search for a TCode which will show me such a report for multiple PP-PI orders with the possibility to...
View ArticlePlanned order not created for first PIR only and generated for others
Dear Sirplease i need your support for below issue.i have a problem we have a material xxxxxxxx with below characteristics : Requirement type : LSFstrategy : 10mrp type : PD we created two PIRs...
View ArticleLSMW for Routing : Production
Hi, I'm using LSMW to create a basic routing i.e., a header material with 3 operations. Nothing more, I have attached the step wise screen shots for references. Issues: 01. In Maintain Field...
View ArticleIs it possible that work center wise production order conformation in...
Dear Experts My client having 5 different Product(FG) and 20 workcenters and he is doing the production any of these work centers to get the product. He is asking that i want to confirm the production...
View ArticleCOGI Error with a Neg value: IMSEG-ERFMG is negative. Only positive values...
We are in ECC 6.0 and still getting this error.! Usually BOM has a +ve value and with shortage of that quanity , COGI shows up with a +ve value ( Mvt type: 261-Consumption). In this case, the COGI is...
View Article[Temporary Storage]
Hi gurus,At the end the production, I need to keep my products in a location as quarantine, for a period of time that depends on the product, before going to quality storage for inspection.I have found...
View ArticleUntick backflush indicator in case COGI happened
Hi All, I want to untick backflush indicator from process order. But in this case material is already withdrawn through COGI. I booked 262 movement still it is not allowing me to untick backflush...
View ArticleHow to get BOM (CS03) item level Valid to date (DATUB) values
Hi Friends, Just i wanted check the validate to date (DATUB) values for all line items of BOM at table level, however i check the couple of tables but i could not find the appropriate one.could you...
View ArticleProduction version
Dear Experts, I have the following queries on production version: 1. If the check date of the production version is earlier (say 30.11.2015) than the valid from date of BOM (say 01.01.2016), then will...
View ArticleLSMW BATCH INPUT WITH TWO FLAT FILES (header & item - BOM).
Hi, In the above execution i maintained two flat files one for BOM Header & another for BOM Line Item (TWO SOURCE STRUCTURES). The problem is i'm have only one recording but two source structure...
View ArticleIn MD04 it shows Shipping Notification (Shpgnt in place of Rcvdnt) for...
Hi Team, MD04 shows Shipping Notification for Purchase order that is not shipped means only AB confirmation was done.No Delivery document done and no changes in Items after AB confirmation.My Client...
View ArticleUnable to convert planned order to purchase requisition
Dear Team, We are using MTO-REM scenario. Planned order is generated after MRP Run as procurement type maintained was 'X". Now, only half of the quantity I want to produce in house and the remaining...
View ArticleMRP and ATP
In MD62 header screen we are selecting "w/o MRP" check box for entered forecast. So MRP doesn't consider forecast for planning. In this case FERT material is make-to-stock type. So if there is stock...
View ArticleReport of Schedule line agreement
Dear all, This is a report of schedule line agreement. And the problem is as follows. After running MRP schedule released for components, Schedule quantities are not being distributed through out month...
View Articleno message logs in cohv
In mass processing transaction- COHV, when I try to do the TECO for production orders. I get the prompt There are processing records and the order cannot be technically complete. In the prompt, when I...
View ArticleConverting Dispatched Planned Orders (Process)
Hi,In an integrated environment [Planning is carried out in 3rd party tool, MRP is not executed in ECC, and CM25 is used for capacity leveling), the planned orders [generated in 3rd Party Planning...
View Article