Routing operation overview long text
Hi Experts, any one can tell me the table the name where the Routing operation overview long text has been stored?
View ArticlePP Reports for Routings
Hello, There is any report showing the working hours (from the routings) for all products manufactured per month in each Plant? Thank you
View ArticleIssue in UOM for material while synchonising recipe to BOM
Hi All, I am facing an issue when synchronizing the material to BOM. When synchronizing Recipe to BOM, BOM component is updated as per base unit of measure even though alternate UOM is maintained in...
View ArticleBatch in process order
Hello Experts, We have a few materials for which the batch management is activated in the material master level.But the batch is not displayed at the order level.Please refer to the attached...
View ArticleAssigning Intermediate operations in Routing with select Qty than Production...
Hi,We have a scenario of assigning Intermediate operations with selected quantity in Production Orders. Production order is released for 100 numbers. After release of Production Order Shop floor...
View ArticlePP Production Order Confirmation error due to shortage of Materials
Details:-Header Material: - AHeader Material Weight Spec: - Minimum Weight = 9.5Kg Average Weight = 10 Kg...
View ArticleCO15
Hi,GurusCurrently my client is performing (with no issues whatsoever) production order confirmations via CO15.But now there is a business need to include extra inputs in the PO confirmations (like...
View ArticleSame Operation Number create with same operation.?
Hi..!! Gurus It can be possible to add same operation with same operation number for creating Production Order Number.?if this is possible so give me answer with all steps.. thanks..
View ArticlePP Functional Specification
Hi, I am new to SAP PP module. Looking for some sample Functional Specification doc., So that I can have a good idea as well as a good reference. Your help will be appreciated.
View ArticleCalculate quantity based on characteristics in variant BOM
Hi all,I need help in the stated issue. I am creating BOM of one assembly. assembly is variant configured. i want to calculate bom line item quantity based on characteristics value. e. g. Line 0020 =...
View ArticleHow we get manufacturing date popup for partial confirmation
Hi Experts, We have MTO scenario where we maintained Z table for calculation for shelf life calculationWhen we do GR for process order ,we enter manufacturing date in popup which is automatically up...
View ArticleMC88 - Message no. MA300 - No resource load exists
Dear All, I am facing a problem in MC88 while i click on views > Capacity situation > Rough cut planning > Show.It is showing the msg as Message no. MA300 - No resource load exists for only...
View ArticlePlanned Orders requirement date
Hello, For a given requirement planned orders are created in MRP, these planned orders are then converted to production orders (in case of in-house procurement).The finished material has a lot size key...
View ArticlePP Reports for Routings
Hello, There is any report showing the working hours (from the routings) for all products manufactured per month in each Plant? Thank you
View ArticleMRP BADI MD_MODIFY_PRODVERS can't be called
Hi experts, I know the BADI MD_MODIFY_PRODVERS is not valid in ecc6.0, but I still need to change the production version for subcontracting. I need to change production version according to the...
View ArticleBOM ALEKZ INDICATOR ISSUES
Hello friends, We create and update the material and BOM in sap via ALE transfer the data from a PDM interface to the ERP system SAP. When the transfer is done the ALE indicator is active so future...
View ArticleNo movement type 531 happening automatically for returnable byproduct in...
Hi SAP Gurus, We have created a new plant. While processing the process order, when we were taking unplanned goods issue for returnable items, only mvmt type 261 is happening and no movement type 531...
View ArticlePRT Materials Availability checks in Production order creation time
Dear PP Expert, I have created PRT under Material category, and assigned to the PP Routing.PRT Material Number = xPRT Material Quantity = 1Production Order created Material = A...
View ArticleStrategy 50 - Qty Reduction not happening in VP type Planned Order.
Hi, The following example is as same as my requirement. But Planned Order type VP doesn't reduce its qty in next MRP Run as underlined in the e.g., Strategy : 50 , Ind / Coll : 2. Consumption Indicator...
View ArticleSOME MATERIALS ARE NOT INCLUDED IN THE MRP JOB RUN
Hi, In our plant X there are 100 materials (of MRP type p3 )for which MRP job run everyday. But recently what we have observed is some materials are not included for the MRP runs for some days because...
View Article