How to firm the planned orders for mrp type p3

Hi Please guide me in firming the planned orders for MRP type p3. I have tried firming by setting the manual firming date but after the next MRP run the planned orders are again pushed out of planning...

View Article


Use of LOIBOM idoc instead of BOMMAT idoc

Hello Experts Currently our client is using BOMMAT message type idocs to send BOM information to legacy systems. But BOMMAT is having limitations of only sending simple boms ( only Alt 1 BOMs). Also we...

View Article


Inconsistency in operations display data between CEWB and CA03

Hello All, I am having an issue with data inconsistency between CEWB and CA03 transactions. In CEWB transaction, all the sub-operations for an operation are not visible but are correctly shown up in...

View Article

Image may be NSFW.
Clik here to view.

Batch searching procedure by Batch creation date in FIFO basis

Sir, My Client asked me to do a batch searching procedure by batch creation date at time of material consumption in COR6 . I have tried to do so but  I am getting error. I just posting a demo scenario...

View Article

Image may be NSFW.
Clik here to view.

No product costing estimate could be found,Message no. KE380

Hi, When i am going to release  The Document from VF02 To accounting section ,I am getting this error,How to release this Document Could you please help on this. DiagnosisIn Profitability Analysis...

View Article


Image may be NSFW.
Clik here to view.

Problems with confirmation Cancelling with CORS

Hi there, the problem i have is this: The user made a order confirmation with the tx COR6N , but later realize that he made a mistake so he cancelled the confirmation with the tx CORS , then he...

View Article

CEWB

Hi Is it possible to run CEWB in background? I'm changing 20k BOMs and it really takes time milk

View Article

MD12 badi or user exit for delete any planned order with control

Hi everyone,  I want to put custom control while deleting planned order in MD12  but ı couldnt find any exit for this deleting event?  Any help will be appreciate.  thank u best regards.

View Article


Material Requirement Planning for Similar Raw materials

Hi All I have similar kind of raw materials which are used in different FG/SFG BOMs. These raw materials are alternative to each other, so I want to run MRP for all these raw materials and total...

View Article


Undelete the item from BOM in production order.

Hi Experts,Is there a way to "Undelete a item from BOM ?, We have deleted item in BOM from one production order.Can I re-vitalize the BOM item again?we cannot seem to find a option to do this.Please...

View Article

Undelete the item from BOM in production order.

Hi Experts,Is there a way to "Undelete a item from BOM ?, We have deleted item in BOM from one production order.Can I re-vitalize the BOM item again?we cannot seem to find a option to do this.Please...

View Article

How to get the process time value Uom in Afvv table.

Hi,I need a small information. My Requirement is i would like to get the process time of the Operation. What we are entering at Routing. For this i had choose the table AFVV Table.  Process time field...

View Article

After MRP run in MD02 not generating schedule lines ,it crates PR

Hi Greetings, After  MRP run in MD02, it is not generating scheduling agreement, it creates Pur.requisition, All parameters are correct, last month it created properly, what could have happened this...

View Article


PR will be generated after considering own stock + Jobber Stock

Dear Expert,  We make a production through sub contracting . we send component material to jobber for FERT production , some of the time some stock lying with jobber , that is reflected in MD04 list...

View Article

Image may be NSFW.
Clik here to view.

Material posted in COGI, when BAPI is used for Goods Movement

Hi, Good Morning...! Presently, we are using BAPI to confirm the production : FM - BAPI_GOODSMVT_CREATE , it is working fine , but sometime material posted into the COGI and from COGi manually even we...

View Article


Image may be NSFW.
Clik here to view.

Long term planning execution - step by step

Long term planning is being used to simulate the future demand in all BOM levels. Main intension is to check the capacity situation, material requirement and vendor /supplier ability to provide the...

View Article

Flexible analyses usage

Dear all, Could you please explain the main usages of Flexible analyses in PP purposes. Is it possible for example to build a report based on real production order quantities and times ? The idea is to...

View Article


cs11 not showing negative quantity for scrap or weste material.

Hi, when i was try to creat BOM of finish product . I add all row materials and also show scrap materials. but scrap material must be in negative quantity in BOM but it not taking negative values....

View Article

How to design the process order in this scenario?

01 no. Process Order will be created for a particular process where BOM Components are not fixed for the product.  There is no BOM component of header material for this process. We have to create...

View Article

SAP DMS

New to dms in sap. want to use for batch related documents (ms word). have some silly basic questions. appreciate your response.1. in cv01n, have seen fields like storage type. what is meant by storage...