Quantcast
Channel: SCN : All Content - SAP ERP Manufacturing - Production Planning (SAP PP)
Browsing all 1791 articles
Browse latest View live

101 error in cogi

how to clear cogi error 101

View Article


Activity Price is not capturing in process order costing view.

Dear friends, I have done all configuration and master data maintained for activity cost calculation in process order,in that only water price is not capturing in process order costing view. Please...

View Article


COGI- Post processing records (REM) history of deleted records

How can we know and see the history of deleted COGI records in the system. Any log and/or table that stores it.?I see in forums that AFFWPRO (Table ) is not useful!

View Article

MRP elements (Requirements) for LTP

Hi All, Could you please let me know the MRP elements (Requirements only) that are considered for the long term planning? My requirement is that stock transport order (MRP element Ord.DS) should be...

View Article

Routing creation from MES

Hello All, We are planning to create routing from MES and it would be sent to ECC through middleware (SAP-PI). The question really is - What is best way to create it- idoc?- Webservice if...

View Article


PIR consumption for MTO scenario

Hi All,I know that using strategy 50 we can consume the sales order with planned independent requirements using the requirement type VSE. Is there a way that stock transport order can also be consumed...

View Article

Scheduling date of PO in MTO

Running MTO scenario. Case-1: Creating sales order with RLD date 5-April-2016 but order is confirming on 6th April. If I check PO in this case it is getting completed on 6th April. 6th April is Basic...

View Article

Equipment Master tracking for non-serialized materials

I am looking for a common way to track shop floor work for both serialized and non-serialized materials.  Equipment masters perform a great deal of the functionality I want, of course for serialized...

View Article


Creating planned orders during MRP run

Hello. We have  production version for material "A". In the BOM of "A" there are material "B", which has production version too.So we need to plan this - create recuirement for material "A". Run MRP...

View Article


URGENT:UNABLE TO DO GOODS ISSUE IN MIGO

Hi present process order status is:REL  CRCR PRC  BCRQ MACM PIGN SETC *No  goods issue was done to the process order(materials were not yet processed) *No confirmations were done. *NO ERRORS IN COGI...

View Article

What is the difference B/w OOABAP and ABAP?

Dear All, Please explain which one we can do by using OOABAP and which one can't by using procedural ABAP.Give me better example. i know the syntax's, but i am not able to see what impotence...

View Article

Production order Confirmation with process message

Hi All  Iam using process message PP_OPCON  for doing confirmation in production order,  also i have confirmation profile which is set to proposed activities. When process message is send to production...

View Article

LTP planned order to be created with different order type

Hi All, I need your suggestions to differentiate the simulation planned order and the operative planned order. At this moment the simulation order type is same as the operative order type after running...

View Article


Scheduling Automation in CM25

Few issuesLooks like I will be able to stack more than one job per jet at a time there is nothing preventing me from doing this.Seems a bit more manual than what I was doing.How do you get it to be...

View Article

How Scheduling parameter start date in the past to be set for X days

Hi All,The planner is making the production schedule in ABC planning tool and transfers this to SAP.On a daily basis the planning is reviewed and rescheduled to the actual production. With the...

View Article


IN COR6N t.code Need to change 15 actual activity

Dear Friends,  In cor6n my client wants to change the more then 6 activity .if I assigned in c202  2 work center with 5+ 6 activity  system throw error  in cor6n‘phase/Operation in process order does...

View Article

Industrial waste material treatment process mapping in PP

Hello....Experts. I want to map industrial waste material treatment process in PP for my client along with CO.Client has a requirement for process based costing. The waste is received from different...

View Article


data table for mmbe

hi all, in MMBE t code we can see unrestricted , quality & reserved stock. can anybody please tell me for this tcode which tables SAP calculates ?

View Article

Waste Material Treatment Process Mapping in PP Module

Hello Experts,  We want to map waste material treatment process in PP module along with CO for my client .They require process based costing.Client receives waste material from customer and according...

View Article

Issue with GR Qty - Batch Specific UOM

Hi, I am facing problem while posting Goods Receipt for Raw Milk in Liters as the KG equivalent is not getting derived properly. For raw milk stock keeping unit is KG and receiving unit is liters....

View Article
Browsing all 1791 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>